Western Australian Sheet Piling Specialists

Soldier Piles

Soldier piles and lagging walls are used primarily for temporary excavation support. These walls are constructed by installing vertical soldier piles, typically H beams, from the original grade before excavation begins. The excavation is performed in lifts of 4’ to 5’ so that the timber lagging can be installed between the soldier piles to restrain the soil.
1 product